A wall that is eight years old is usually a sound building with tired modules. The question is not whether the screen is old — it is how much of it can be kept once the pitch, the power and the access have been checked.

Outdoor LED facade on a building at dusk
Facade · existing structureRetrofit starts with a survey
01 / FOUR CHECKS

Four checks decidekeep or rebuild.

Run them in this
order, not in parallel

CheckKeep the structure ifRebuild ifWho measures it
StructureSteel is straight, fixings hold, corrosion is surface onlyLoad path or fixings have failed, or the wall must growStructural engineer, on site
PowerDistribution has headroom for the new loadThe new wall needs more circuits than the building can giveYour electrician, against our load figure
AccessThe existing service route still reaches every cabinetModules can only be reached by scaffold or rope accessYou — this one is decided by the building, not by us
GeometryNew cabinet size divides into the existing openingThe pitch change forces a different cabinet moduleUs, from your measured opening

The geometry check is the one that kills most retrofits. Keeping the opening means keeping a cabinet size that divides into it; a finer pitch in the same opening usually changes the module count, not the outline.

02 / REPLACEABLE

What comes off,and what stays.

Same building,
new front

R1

Modules and cabinet fronts

The part that carries the LED and the driver. Normally the whole reason for the retrofit.

R2

Receiving cards

Replaced with the modules when the control protocol moves on; kept if the cabinet and card generation still match.

R3

Power supplies

Usually replaced with the modules — an old supply running new modules is where a retrofit fails six months later.

R4

Control system

Replaced when the old sender is out of support. This is the change most often forgotten in the budget.

R5

Structure and steelwork

Stays. This is the cost the retrofit is trying to avoid, and the reason the four checks come first.

R6

Cladding and trim

Stays if the outline stays. A pitch change that alters the cabinet module usually takes the trim with it.

LED cabinets stacked during installation
Cabinet stackOutline kept · front replaced
03 / SEQUENCE

Six steps,and where the risk sits.

Standard build
30 days

01

Survey

Opening measured, structure photographed, existing power and control documented.

02

Specification

Pitch chosen against viewing distance and the opening, not against the old pitch.

03

Sample on site

One cabinet built and powered in place before the order is released. This is the step that catches a geometry error cheaply.

04

Production

Standard lead time is 30 days. Fine pitch and gold-wire builds are confirmed separately.

05

Delivery

Modules, cards and supplies ship together, with 2% spare modules as standard.

06

Fit

Indoor and no work at height, with the client, the end user and local law all allowing it: we assist. Outdoor: guidance only — we hold no working-at-height certification.

The risk is nearly always at step 03. A sample cabinet in the opening costs a fraction of a wrong order, and it is the only check that proves the cabinet module, the trim and the access all agree.

04 / WHETHER TO BOTHER

When a retrofitis the wrong answer.

Said before
you spend

A retrofit only pays when the structure, the power and the access all survive it. If two of the three need work anyway, the saving is small and the schedule is longer than a new wall — because the site is occupied. We will say so at the survey stage. For a sun-facing facade, industry guidance for brightness runs 5,000–7,500 cd/m²; if the existing power cannot carry that at the required area, the retrofit case is already over.

What we hand overbefore any order.

A measured opening, a pitch recommendation against your viewing distance, a load figure for your electrician, and a written note on what your existing structure can carry. If the answer is "rebuild", that note says rebuild.

SurveyPhotos, opening dimensions, existing control and power
OutputWritten spec · load figure · keep-or-rebuild verdict
Lead time30 days standard · fine pitch / gold wire confirmed separately
Warranty2 years standard on the new modules and cards