From the archive/Filed 2022 · facts unchanged, English rewritten/GO LED SERVICE was the service entity in Europe at the time
ArchiveEurope1 Mar 2022

What we had to re-sequence in 2022

Orders went up while people stayed home. Three compromises we made that year, written down at the time so nobody later mistook them for policy.

GO LED SERVICE · EuropeOriginally published 1 Mar 20223 min read
Order arrangement banner

Fig 01 — The original banner. The title was accurate: this was about arrangement, not about volume.

The squeezeMore orders, same number of people.

By 2022 we had customers with repeat orders, which is the point at which a service business stops being a series of favours and starts being a schedule.

What we did not have was more engineers. The demand arrived faster than the hiring, and the honest description of that year is not growth. It is triage.

ContextEurope was reopening in stages, freight was unstable, and travel rules changed more often than a delivery schedule could absorb.
Onsite work

The first thing to go was travel. Outside Benelux we suspended onsite installation, onsite troubleshooting and onsite maintenance, and kept only remote diagnosis and workshop repairs.

That hurt the German market most, because it was our largest area for NNP products and the one where a site visit resolves in an hour what a video call cannot resolve in a week. We said at the time that we would restart onsite work as soon as conditions allowed, and we did. For the period this was written in, the constraint was real and we chose it deliberately: an engineer in a hospital bed is not an engineer.

Order intake

The second was intake. Orders with many product types and few units each are the expensive kind, because the setup cost does not scale down with the quantity. We started asking customers to either delay those orders so they could be batched, or consolidate them into a single variety.

Nobody likes being told to order differently. The alternative was worse: a queue in which every small mixed order waits behind the last one.

The rule we usedFewer varieties, more units per run. A mixed order of six types and twelve units costs more to serve than one type and thirty units.
Pricing

The third was price. Tax rules, fuel and commodity costs were moving fast enough that a quotation printed in January could be wrong by March, so we moved to quoting against the current situation rather than publishing a list.

Where an urgent order could not be met at all, we referred it to partners we knew rather than let it fail quietly. That has never been a popular thing for a supplier to do, and it is the reason some of those partners referred work back.

Alongside all of that we were adding engineers with practising certificates, which is a slow process measured in months and the only one of the four that helped the following year rather than the current quarter.

The four arrangements above were temporary. The reason for writing them down was so that a customer reading them in a later year would know which parts were a policy and which were a period.

Ordering across several product types?

Send the list before you send the order. Batching a mixed requirement into fewer runs is usually a saving on both sides, and it is easier to do before anything ships.

TALK TO SALES →
Filed · Company · Archive 2022Next: Why site-visit cost had to rise